Tags Su Tu field cluster PV DRILLING I to drill Sư Tử field cluster from March 2026 Friday, Nov 21, 2025 Under the signed contract, PV Drilling will supply the PV DRILLING I jack-up rig to PVEP Cửu Long, with three wells in the Sư Tử (Lion) field cluster, Block 15-1, with an expected duration of 249 days.